Friday, November 20, 2009

Hardwood floor progress

The nailing down of the raw oak wood planks\strips is just the first step. After that, the floor gets sanded, then gaps and imperfections get filled with a wood filler, then more sanding, then "buffing" (uses a 100 grit "screen"), finally followed by the actual sealer coats.

Paul had mentioned that sometimes the floor crews will trowel a coat of filler across the entire floor, but our crew only did spot filling:

This was just the first pass around the room perimeter, which gets sanded down first with a small hand-held sander.

This is the goop they use:

The buffer machine at work:

The bullnose edging around the top of the stairs was the last thing to get done before the second floor sealer coats could be done. Here the pieces are getting dryfitted:

The joints were then rough-sanded, then coated with filler like the rest of the floors. This is Sasha (the owner of the company, Quality Flooring) - sanding down the dried filler...

...followed by a buffing job like everywhere else. The edges, nooks, and crannies were hand-sanded.

With that done, things were nearly ready for the first coat of sealer. All that remained was to do a meticulous cleaning job. I watched Sasha and his crew do the cleanup and I could not have done a better job myself: first they did a very careful vacuum job of every square inch of floor, including going around the room perimeters with a nozzle to suck out any dust, followed by a final pickup with a specially made dust-mop. The vacuum got almost everything, but even with the dust mop they frequently stopped to vacuum the bottom of the dust mop itself - wow. I was impressed to see that.

Now it was time for the first coat of sealer, and this was the part I was waiting for. There are several types of floor finishes, but I had always wanted the famed "Swedish" finish. Apparently these days they have the traditional Swedish, along with new water-based formulas. The floor guys said either choice would be durable and attractive, but it was my choice. In the end, I decided to go with the traditional Swedish formula. This stuff has been used forever, like easily 40+ years, and is time-tested. Glitsa is the supplier and they are a local Seattle company.

If you look around on the Glitsa web site, you will see that they have multiple different coating options, which vary essentially by # of coats, types of coats, # of days needed for application, etc. I did my best to research the options and decided that two coats of Glitsa Sealer followed by a coat of Glitsa Gold Seal would work great. Sasha confirmed this as a good option and said it's what he normally uses. :-)

Here's the Glitsa Sealer with its hardener component:

Finally, the moment of truth! Here the very first sealer coat is getting applied:

Sasha said that the color above will be very, very close to the final color. It looks great, and makes me happy we didn't spend the money for extra stain.

The brush in the picture above is used for edging and tight spots. A lambs-wool applicator is used for covering the majority of the floor:

I like this picture as a nice contrast of the raw wood and the coated wood:

One of the big drawbacks of this stuff is the smell....it is a very strong chemical, and I didn't have a respirator mask. So I only lasted about ten minutes before deciding it was a good time to leave :).

There will be two coats of sealer (with a sand and buff job after each coat), then the floor guys will be done until later, right before the house is almost done. Then they come back to do the final coat and buff it out.

Saturday, November 14, 2009

Cabinets and stuff

The cabinets were delivered earlier in the week and are now all installed. This is the desk area in the kitchen:

The kitchen is looking great:

Another kitchen view from a different angle:

Here's a detail shot of the crown and rope-style molding that will be installed at the top of the kitchen cabinets:

One corner of the laundry room:

The countertop in the laundry room will be covered in 6" field tiles, including a matching backsplash, with a nice wood edge. We didn't want to spend more money for granite for this room, but I am sure the tile will look great.

Also in the picture above, the open area under the counter will be left that way as a convienent place to store clothes hampers. The corner cabinet looks a bit awkward, but has two rotating shelves ("Lazy Susans") to make it easier to use the space.

If you look carefully at some of the pictures above, you can see that all of the cabinets have been installed on top of 2" spacers. This is done in order is to raise the countertops to a more "adult friendly" height (i.e., you don't have to bend over quite so far). All of the base cabinets on the first floor (except the kitchen desk) have been done this way.

The hardwood guys have finished nailing down the raw wood and will be starting the finish process on Monday. So far we are thrilled with how the floors are looking (plus the house has a nice "oak-ey" smell to it right now):

The floors look even and flat from a standing viewpoint, but if you get down close you can see that there is a lot of work left to really produce that super-smooth finish that everyone associates with hardwood floors. This picture of my office was taken at floor level:

The finishing process involves sanding, filling, more sanding, cleaning, varnishing, and at some point near the end, a buffing job to really put the shine on things. Hopefully I can get some pictures of these things as they're happening.

Monday, November 9, 2009

Hardwood flooring started

Not sure when the hardwood guys started, but when I got there they were working their way through an upstairs bedroom:

The flooring looks nice! And it feels great to walk on something other than warmboard for a change. We've decided to not stain the floors any darker, ie we're leaving them natural. This will save some money, and also hopefully lighten up some of the darker areas of the house.

The low-voltage guys were also out doing some work; this is what our intercom systems look like:
Looks like most of the phone\data\cable plates have been trimmed out too.

This is Dan, working on our master bathroom shower floor:

The layer of thinset\sand from before was covered with a rubber membrane, which was then covered with more thinset\sand - and I'm not quite sure what comes next! :) There's some chicken wire in there for reinforcement as well. Dan seems to be doing a very meticulous job, which I like (don't need any leaks popping up!).

The auxiliary boiler for our radiant heating system has been installed in the garage:

It looks to be an exciting week...